Troy Lee Designs Y's Flowline Helmet Mips | The BackCountry in Truckee - The BackCountry

Open Daily 8a-6p | 530-582-0909 | [email protected]

Slideshow Items

Troy Lee Designs

Troy Lee Designs Y's Flowline Helmet Mips

$120.00
In store: Check availability

Available in store

SKU: 113540050

Adjustable visor | Mips® protection system | Extended Coverage MTB Trail Helmet

Delivery time: 5-7 Business Days | * This item requires extra shipping costs for size & weight -OR- requires higher shipping insurance.

Description

From the manufacturer

 

Don’t let its casual looks fool you. Flowline quietly intertwines Troy Lee Designs’ dependable helmet protection and comfort features with an affordable price point. Beneath its clean, understated hood, Troy Lee Designs leans on years of helmet technology experience to crank up the performance, earning a Four-Star safety rating from Virginia Tech.

 

Specifications

 

• 3-Way adjustable screwless visor
• Mips® B-Series Rotational Impact Brain Protection System
• Full 360-degree fit retention system with 3-way rear height adjustment
• 14 vents for maximum airflow
• Full wrap in-mold construction
• Extended Coverage MTB Trail Helmet
• Side strap adjusters

 

Recently viewed

Keep in touch

Don’t worry, we won’t spam

Your cart — 0

You cart is currently empty

Login