Troy Lee Designs Flowline SE Helmet Mips | The BackCountry in Truckee - The BackCountry

Open Daily 8a-6p | 530-582-0909 | [email protected]

Slideshow Items

Troy Lee Designs

Troy Lee Designs Flowline SE Helmet Mips

$195.00
In store: Check availability

Available in store

SKU: 110124001

Mips® equipped | eMTB-rated | 360-degree fit retention system

Delivery time: 5-7 Business Days | * This item requires extra shipping costs for size & weight -OR- requires higher shipping insurance.

Description

From the manufacturer

 

Mips® equipped and eMTB-rated, Flowline SE sets the standard for safety within a modern, minimalist design, achieving a four-star safety rating from Virginia Tech. With 14 vents, an anti-microbial liner, and a Fidlock® magnetic buckle system, Flowline SE is the workhorse of trail helmets.

 

Specifications

 

• 3-Way adjustable screwless visor
• Mips® B-Series Rotational Impact Brain Protection System
• Full 360-degree fit retention system with 3-way rear height adjustment
• 14 vents for maximum airflow
• Full wrap in-mold construction
• Extended Coverage MTB Trail Helmet
• Fidlock® Magnetic Buckle System
• Dual Density EPS for low and high-speed impacts
• Anti-microbial Quick Dry Premium Liner
• Side strap adjusters •Exceeds bicycle certifications: CPSC 1203, CE EN 1078, AS NZ 2063:2008*, E-bike certified NTA 8776
(* varies by regional standards)

 

 

 

 

 

Recently viewed

Keep in touch

Don’t worry, we won’t spam

Your cart — 0

You cart is currently empty

Login